Community profile

Album Dorchester

Charleston, SC

55+ communityActive adult

About the community

About Album Dorchester

About Album Dorchester Album Dorchester is a 55+ rental community in North Charleston, South Carolina. Expected to welcome its first residents in December 2026, the community will offer 150 apartment homes with thoughtfully designed interiors and a full suite of social and recreational amenities, including a saltwater pool, fitness center, yoga studio, and clubroom. A professional management team will handle day-to-day maintenance, giving residents more time to enjoy the community and everything the greater Charleston area has to offer. 55+ renters looking for apartments for rent in North Charleston, SC, will enjoy what Album Dorchester has to offer. Album Dorchester Amenities Residents of Album Dorchester will have access to a great room, a demonstration kitchen in the social lounge, a fitness center with instructor-led classes, a yoga and wellness studio, a clubroom with billiards and a coffee bar, a creative arts and business center, a community library, and a reservable guest suite. A second-floor outdoor terrace provides an additional gathering space above the community grounds. Building amenities also include elevator accessibility, a controlled-access entrance, a resident package room, valet trash service with door-to-door pickup, and electric vehicle charging stations. Reserved parking spaces, detached garages, and on-site storage units are available for rent. Outside, Album Dorchester residents can enjoy an outdoor saltwater pool with poolside lounging, a grilling station and dining area, a fire pit with fireside seating, and an event lawn. The community also features a pet spa, an on-site pet park, and a community garden. Album Dorchester Apartment Homes Greystar is developing Album Dorchester with the first units expected in December 2026, bringing a total of 150 apartment homes to North Charleston. Apartments feature open-concept floor plans with granite countertops, stainless steel appliances, shaker-style cabinetry, and wood-style vinyl flooring. Each home includes an in-unit washer and dryer, spacious bedrooms with plush carpet and walk-in closets, and designer lighting throughout. Secondary bathrooms include soaking tubs, and faux wood blinds are included in every home. Select apartments will feature dual vanities and private patios or balconies. Air-conditioned storage units, private carports, and garages are also available for residents who need additional space. Album Dorchester Lifestyle Members of the community will enjoy a low-maintenance lifestyle thanks to Album by Greystar, which handles maintenance requests, emergency repairs, and valet trash service. With more free time, residents of Album Dorchester can enjoy spending time with family or pursuing new hobbies. The community's fitness center, yoga and wellness studio, creative arts and business center, and clubroom all provide opportunities to stay active and connected without leaving home. North Charleston, SC Area Album Dorchester is located in North Charleston, in the heart of the South Carolina Lowcountry, just minutes from downtown Charleston. This prime location puts residents in easy reach of daily needs and fun opportunities. Residents of Album Dorchester are close to daily conveniences, including grocery stores such as Publix and Lidl, both within approximately two miles of the community. Pharmacy needs can be met at Walgreens, located less than a mile away on Dorchester Road. Album Dorchester is also close to multiple health care providers. Trident Medical Center, a full-service hospital with a 24-hour emergency room, is approximately seven miles away. The Medical Plaza complex on Medical Plaza Drive, home to numerous specialist offices, is about five miles from the community. When residents are looking for entertainment and dining options, they can head to Park Circle, a popular North Charleston neighborhood known for its eclectic mix of breweries, gastropubs, and local eateries, about 12 miles from the community. Downtown Charleston's King

Published floor plans

Acacia floor plan at Album Dorchester

Acacia

1 bedroom · 1 bathroom · 670 sq ft

$1,999–$2,174/month

Schedule a visit →
Ashe floor plan at Album Dorchester

Ashe

1 bedroom · 1 bathroom · 724 sq ft

$2,040–$2,115/month

Schedule a visit →
Alpine floor plan at Album Dorchester

Alpine

1 bedroom · 1 bathroom · 751 sq ft

$2,064–$2,124/month

Schedule a visit →
Alpine A floor plan at Album Dorchester

Alpine A

1 bedroom · 1 bathroom · 751 sq ft

$2,074/month

Schedule a visit →
Acacia A floor plan at Album Dorchester

Acacia A

1 bedroom · 1 bathroom · 657 sq ft

$2,090–$2,140/month

Schedule a visit →
Apricot floor plan at Album Dorchester

Apricot

1 bedroom · 1 bathroom · 868 sq ft

$2,157–$2,207/month

Schedule a visit →
Apricot A floor plan at Album Dorchester

Apricot A

1 bedroom · 1 bathroom · 868 sq ft

$2,178/month

Schedule a visit →
Azalea A floor plan at Album Dorchester

Azalea A

1 bedroom · 1 bathroom · 868 sq ft

$2,215/month

Schedule a visit →
Azalea floor plan at Album Dorchester

Azalea

1 bedroom · 1 bathroom · 868 sq ft

$2,315/month

Schedule a visit →
Douglas floor plan at Album Dorchester

Douglas

2 bedroom · 1 bathroom · 903 sq ft

$2,625–$2,700/month

Schedule a visit →
Cypress A floor plan at Album Dorchester

Cypress A

2 bedroom · 2 bathroom · 965 sq ft

$2,774–$3,014/month

Schedule a visit →
Cypress floor plan at Album Dorchester

Cypress

2 bedroom · 2 bathroom · 965 sq ft

$2,814–$2,974/month

Schedule a visit →
Cedar floor plan at Album Dorchester

Cedar

2 bedroom · 2 bathroom · 1041 sq ft

$2,892–$2,967/month

Schedule a visit →
Cambria floor plan at Album Dorchester

Cambria

2 bedroom · 1 bathroom · 1187 sq ft

$2,930–$3,030/month

Schedule a visit →
Cherry floor plan at Album Dorchester

Cherry

2 bedroom · 2 bathroom · 1408 sq ft

$3,347–$3,482/month

Schedule a visit →
Dogwood A floor plan at Album Dorchester

Dogwood A

2 bedroom · 2 bathroom · 1399 sq ft

$3,413/month

Schedule a visit →
Dogwood floor plan at Album Dorchester

Dogwood

2 bedroom · 2 bathroom · 1399 sq ft

$3,413/month

Schedule a visit →

Tracked published prices

Price history by floor plan

Compare floor plans over time. The lowest current option with tracked history is selected first.

Acacia$1,999 observed · tracking future changes
$1,999Aug 5, 2026

One source-published starting price observed so far. No price change has been observed yet.

Verified overview

What we know from public sources

Community type
Active adult community
Age restriction
55+
Community size
150 homes
Home types
Not publicly found
Housing offering
Rental community
Construction years
Not publicly found
Published HOA
Not publicly found
Published monthly rent
From $1,999/month
Community features
Not publicly found
Last source check
August 5, 2026

Source-published features

Amenities and services

Grouped so you can scan what affects day-to-day life before opening an operator page.

Meals & dining

  • Dining

Health & wellness

  • Fitness Center
  • Outdoor Pool

Activities & engagement

  • Library
  • Clubhouse/Amenity Center
  • Arts & Crafts Studio

Outdoor spaces

  • Outdoor Patio
  • Pet Park
  • Gardening Plots

Other published features

  • Lounge
  • Billiards
  • Coffee Bar
  • Multipurpose Room
  • Business Center
  • Demonstration Kitchen
  • Guest Rooms
  • BBQ
  • Fire Pit
  • Event Lawn

Questions to confirm with the community

Current age qualification
Confirm with the community
What the HOA includes
Confirm current services and assessments
New-build or resale availability
Individual listings are not tracked here
Album Dorchester – Charleston, SC | Find With Care